Construction Bulletin

City Projects - Capital Projects Engineering
      
 

Downtown Santa Rosa Streetscape 
Upgrade of soffit lights and installation of illuminate bollards in the 3rd Street underpass at Downtown Santa Rosa Mall, and reconfiguration of ped ramp at the westbound exit from A Street to 3rd Street.
Installation of a new traffic signal at the intersection of Santa Rosa Avenue and Mill/Sebastopol Road.
(Argonaut Constructors - Nick Keane/City - Art Carney)

Fulton Rd Sidewalk Improvements - College Ave to Santa Rosa Creek Trail
To provide sidewalk along the west side of Fulton Road from College Avenue to the existing driveway for the Santa Rosa Creek Trail.
Work expected to start shortly. Lane closures and work are expected to remain between 8:00am to 5:00pm Monday through Friday.
(Yukon Construction – Dan Shieberl / City – Dave Stolte)
 
Geysers Pipeline Stabilization – East Side Road
Pavement repair on Eastside Road between Windsor River Road and Old Redwood Highway and adjusting manholes to grade on Alexander Valley Road between Healdsburg Ave and Highway 128. 
Intermittent traffic control 7:00 am to 7:00 pm with lane closures and detour as necessary.
(Piazza Construction – James Piazza Jr./City – Eric Frye)

Neighborhood Streets Initiative and Roseland Street Overlay
2.35 miles of pavement resurfacing including 72 ADA compliant curb ramp improvements at the following locations:

  • 1- Cherry Wood DR from Beechwood DR to Rosewood DR. 
  • 2- Cunningham WY from Fairbanks DR to Redford PL. 
  • 3- DeTurk AVE from Bennett Valley RD to the end. 
  • 4- Dutton Meadow from Cass ST to 450’ south of Hearn AVE. 
  • 5- Fairbanks DR from Peterson LN to Cunningham WY. 
  • 6- Goodman AVE from Cul-du-Sac to 270’ north. 
  • 7- Greenwood DR from Beechwood DR to Corby AVE. 
  • 8- Inglewood DR from Beechwood DR to Corby AVE. 
  • 9- Pinewood DR from Beechwood DR to Rosewood DR. 
  • 10- Sunset AVE from McMinn AVE to West AVE. 
  • 11- Temple AVE from Bennett Valley RD to the end.
    (Ghilotti Construction – Chuck Rackerby / City – Art Carney)    

Pavement Preventive Maintenance 2017 
Pavement repairs and slurry seal on Fulton Road from College Avenue to Guerneville Road, Guerneville Road from within city limits to Marlow Road, Sonoma Avenue from Santa Rosa Avenue to E Street, Bicentennial from Range Avenue to the freeway overpass, and Montecito Boulevard from Middle Rincon Road to Calistoga Road.
Intermittent traffic control and lane closures from 8:00 am to 5:00 pm.
(Argonaut Constructors - Dan Giordani/City - Ed Skultety)

Post Court and Simpson Place Sewer Replacements
This project will replace two sections of sewer main and service laterals on Post Ct. and Simpson Places. This will eliminate frequent maintenance that is required due to existing sags in the sewer mains.
(TerraCon Constructors – Mike Lydon/City – Randy Inselman)

SMART Bus Turnout - Guerneville Road  
Construct a bus turnout on Guerneville Road between the SMART rail and Herbert Lane.
One-lane closure, eastbound Guerneville Road, 8:30am to 4:00pm.
(Nelson Construction - Pat Nelson/City - Greg Loraditch)

Santa Rosa Complete Streets Road Diet on Transit Corridor
Santa Rosa Complete Streets Road Diet on Transit Corridor
Repave W. Third Street from 1,100 feet west of Dutton Avenue to Roberts Avenue and Mendocino Avenue from Steele Lane to Administration Drive. Curb ramps will be constructed to meet current standards in both locations. W. Third Street will be restriped to include a single travel lane in each direction, a two-way center turn lane, Class-2 bicycle lanes and street parking.
• W. Third Street progress: Punchlist items are being populated.
• Mendocino Ave progress: Overnight paving operations are expected to start November 5th, 2017; once the paving work starts, expect delays in the area and please choose alternate routes to limit use on Mendocino Avenue from Steele Ln/Lewis Rd north to Administration Dr/Chanate Rd. The night paving operations are expected to not exceed one week depending on the weather and are expected to remain within 8:00pm and 6:00am. Intermittent traffic control 8:00 am to 4:30 pm may occur during this time with lane closures and detours as necessary.
(Team Ghilotti - Karen Toso/City - Bernie Alabona)


Seismic Upgrades and Improvements Phase 4 – R3, R7 & R12B and Various Other Site Improvements – S1, S2, R6 & R12A

Seismic upgrades and piping & electrical improvement at three water storage tanks, paving and driveway improvements at water pump stations S1 & S2, coating repairs at water storage tank R6, and electrical and security improvements at water storage tank site R12A
(Paso Robles - Donny Cook/City - Dave Keck)

Spring Lake Lift Station Improvements
Stabilize ground settlement around lift station equipment, upgrade station controls and improve site layout
(Gregory Equipment Inc. - Jess Gregory/City - Dave Keck)

Stony Point Road Reconstruction and Widening  Phase - 2 Sebastopol Road to Hearn Avenue
Road work and Utility Installations. Intermittent traffic control with lane closures and detours anticipated, 7:00 a.m. to 4:00 p.m. For more information, visit www.stonypointroad.com.
Bay Cities Paving and Grading - Earl Cyr, Superintendent & Ryan Smith, Project Manager/GHD - Jane Rozga, Project Manager/City - Mimi Arvin, Construction Manager

W 6th St at Madison St Sewer and Water Improvements
Along W 6th Street, west of Madison Street replace 400 feet of sewer main and laterals, replace 400 feet of water main and laterals and repave road.
(Argonaut Constructors – Kevin Rowe/City – Jerry Winterlin)


     

Private Development Projects - Engineering Development Services

Auberg Du Soleil Subdivision – 2129 Dennis Lane
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Nunley Engineering/City - Bob Oller)

Barnes South Subdivision:  Barnes Road south of Dennis Lane
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018. 
(Russ Noble Construction/City - Bob Oller)

Bay Village Subdivision – Bay Village Avenue
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Serres Construction/City - Bob Oller)

Calistoga Village Subdivision:  Calistoga Road at Sonoma Highway
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Northwest General Engineering/City - Bob Oller)

Canyon Oaks Townhomes – 4611 Thomas Lake Harris
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Northwest General Engineering / City - Bob Oller)

Clover Townhomes – 1137 Clover Ave
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018. 
(Dufloth Constructors /City - Bob Oller)

Crossroads Apartments –1990 Burbank Avenue
New sewer and water main installation Burbank Avenue, Liana Drive, Biwana Drive.   Monday to Friday, through December 2017.
(Midstate Construction-Randy Groswird/City – Seth Oaks)

Dennis Lane Development – 2169 Dennis Lane
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Blue Mountain Home / City - Bob Oller)

Fox Hollow Subdivision – 1615 Fulton Road
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(City Ventures, Mountain Cascade/City - Bob Oller)

Francisco Village West Subdivision – Francisco Ave.
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Northwest General Engineering/City - Bob Oller)

Kaiser Hospital MOB – Corporate Center Parkway
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Ghilotti Construction / City - Bob Oller)

Kawana Meadows Subdivision: Kawana Springs Road at Petaluma Hill Road
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Argonaut Constructors/City - Bob Oller)

 
Lands of Adobiness Subdivison - 800 Los Olivos Road
Water, sewer and roadway improvements.
Intermittent detours 8:30 a.m. - 4:30 p.m., Monday to Friday, through November 2017.
(Benward Construction/City - Bob Oller)

Meadows at Taylor Mountain Subdivision – 1370 Kawana Terrace Ave
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Wildcat Construction / City - Bob Oller)

Minwath Townhomes PM669 – 619 Avalon Ave.
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(JD Excavating/City - Bob Oller)

Montgomery Creek Subdivision – 4743 Montgomery Drive
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(JD Excavating/City - Bob Oller)

Morroco Frontage Improvements – 5080 Morroco Ave
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Staggs Construction / City - Bob Oller)

PG&E Gas Main Reconditioning:  Intersection of Stony Point Rd at Sebastopol Rd.
Traffic control detours, closures and pedestrian controls; pavement and concrete restoration work; Night work Sunday – Thursday 9pm-5am through October 20,2017
Oller / PG&E / Mears Const.

PG&E Gas Main Repair:  Intersection of Stony Point Rd at Sebastopol Rd.
Northbound 1 and 2 lanes at the intersection of Stony Point Road and Sebastopol Road are closed.  Only one northbound lane is open.  Signals are in flash mode all drivers must stop at intersection.  Lanes will remain closed until Saturday early evening while PG&E is working on gas main repairs.   Take alternate routes if possible.

Traffic control detours, closures and pedestrian controls; pavement and concrete restoration work; Night work Sunday – Thursday 9pm-5am through October 30,2017
Oller / PG&E / Mears Const.

Paseo Vista Subdivision:  2290 Dutton Ave
New City Water Mains and Services
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Sunshine Construction/City - Seth Oaks)

Pink Viking Subdivision – 1420 Ridley Ave
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Argonaut Constructors/City - Bob Oller)

Prospect Village Unit 2 Subdivision: Acacia Lane
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(JD Excavation/City - Bob Oller)

Prospect Oaks Subdivision:  4599 Sonoma Highway
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Carlisle Construction/City - Bob Oller)

Rachel Drive Subdivision – 375 Brittain Dr.
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Nunley Engineering/City - Bob Oller)

Range Ranch 2 - Range Avenue
Street, sidewalk and utility improvements.
Intermittent traffic control including detours on Jennings Avenue. 8:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Kattera Construction/Northwest General/City - Bob Oller)

Ravello Subdivision – Guerneville Road at Marlow
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Northwest General/City - Bob Oller)

Sandalwood Subdivision – 1130 Gordon Lane
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(Argonaut Constructors/City - Bob Oller)

Santa Rosa Creek Box Culvert Restoration – E Street at Santa Rosa Creek
Traffic and pedestrian controls 7:30 a.m. - 4:30 p.m., Monday to Sunday, through October 2017.
(Sonoma County Water Agency / City - Bob Oller)

Skyhawk Subdivisions – Sunhawk Drive, Yerba Buena Drive
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(APM Homes/Argonaut Constructors-Kevin Rowe/City - Bob Oller)

Santa Rosa Charter School – 756 Humboldt Street
Street, sidewalk, utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2017.
(Bay City Paving Grading-Oscar Briceno/City - Bob Oller)

Smith Village Subdivision – 3665 Sebastopol Rd
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Ghilotti Construction/City - Bob Oller)

Steele Lane Cottages Subdivision - Steele Lane at Northcoast
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018.
(JD Construction/City - Bob Oller)

Tapestry Subdivision - San Miguel Road at Peterson
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through July 2018. 
(Argonaut Constructors/City - Bob Oller)

The Villas Apartments  - 1755 Sebastopol Road
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Northwest General Engineering / City - Bob Oller)

Village Gardens at Sebastopol Road and Boyd Street
Street and sidewalk improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Northwest General/Blue Mountain/City - Bob Oller)

Wildflower Subdivision - San Miguel Road at Peterson
Street, sidewalk and utility improvements.
Intermittent traffic control 7:30 a.m. - 4:30 p.m., Monday to Friday, through December 2018.
(Argonaut Constructors/City - Bob Oller)

 

All dates and times are subject to change.
Work will be done Monday through Friday unless otherwise noted.
Access for emergency vehicles will be provided.
Postal delivery will continue as usual.