HOME
VISITORS
RESIDENTS
BUSINESS
GOVERNMENT
DEPARTMENTS
 
 
 

*** NOTICE ***

All discretionary projects, and most building permit submittals, must include the Storm Water Determination Worksheet to identify whether or not the project is required to include post-construction storm water treatment BMPs. Projects that are required to implement post-construction storm water treatment BMPs should provide a Preliminary Storm Water Treatment Plan with the discretionary permit application(s).  The revised storm water treatment requirements are summarized on the City's storm water webpage.

An electronic form of this worksheet as well as a manually completed form of the worksheet and a LID Design Calculator are available for download from the City's Stormwater LID Technical Manual.

BUILDING FORMS

PLANNING FORMS

      Frequently Used

           Signs:

       Other Planning Forms (A-Z)

ENGINEERING FORMS