| Studies & Reports |
Date |
PDF File Size KB |
| Erratum |
4/03/08 |
86 |
| Notice of Preparation and Initial Study |
| Discharge Compliance Project Revisions to the August 2006 Notice of Preparation and Initial Study |
5/03/07 |
15,354 |
| Notice of Preparation and Initial Study |
8/01/06 |
1,259 |
| Draft Screening Report |
| Draft Screening Report |
11/16/06 |
2,050 |
| Scoping Report |
| Scoping Report |
03/08 |
2,233 |
| Comment Letters: 201-218, 301, 302-1 to 302-30, 302-31 to 302-32, 303-329, 330, 331 to 550, 551, 552-573, 574-1 to 574-39, 574-40, 574-41 to 574-50, 574-51, 574-51 Part 2, 574-52 to 574-53, 574-54, 574-55, 575-591, 593 to 605, 606-1 to 606-5, 606-16 to 606-37, 606-38 to 606-53, 606-6 to 606-15, 607 to 703 |
03/08 |
- |
| Preliminary Engineering Report for Discharge Compliance Project |
| Table of Contents |
7/14/06 |
47 |
| Executive Summary |
7/14/06 |
699 |
| Glossary |
7/14/06 |
33 |
| Section 1: Background and Purpose |
7/14/06 |
726 |
| Section 2: Recycled-Water Flow Projections |
7/14/06 |
138 |
| Section 3: Regulatory Compliance Requirements |
7/14/06 |
129 |
| Section 4: Facilities Description |
7/14/06 |
1,426 |
| Section 5: Analysis of Direct Discharge to Russian River |
7/14/06 |
2,049 |
| Section 6: Analysis of Indirect Discharge |
7/14/06 |
1,769 |
| Section 7: Analysis of Conveyance System |
7/14/06 |
3,469 |
| Section 8: Alternatives Development |
7/14/06 |
4,423 |
| Appendix A |
7/14/06 |
25 |
| Appendix B |
7/14/06 |
3,687 |
| Appendix C |
7/14/06 |
19 |
| References |
7/14/06 |
75 |
| Draft Environmental Impact Report - Volumes 1--6 |
| Table of Content & Summary |
3/14/08 |
162 |
| Glossary |
3/14/08 |
154 |
| VOLUME 1 of 6: Draft Environmental Impact Report |
| Chapter 1 Introduction and Summary |
3/14/08 |
961 |
| Chapter 2 Project Description |
3/14/08 |
9,340 |
| Chapter 3 Mitigation and Monitoring Program |
3/14/08 |
388 |
| Chapters 4.0 Environmental Analysis Introduction and General Setting |
3/14/08 |
1,616 |
| 4.1 Land Use |
3/14/08 |
599 |
| 4.2 Agriculture |
3/14/08 |
221 |
| 4.3 Geology, Soils, and Seismicity |
3/14/08 |
1,359 |
| 4.4 Surface Water Hydrology |
3/14/08 |
413 |
| 4.5 Groundwater |
3/14/08 |
1,539 |
| 4.6 Surface Water Quality |
3/14/08 |
762 |
| VOLUME 2 of 6: Draft Environmental Impact Report |
| 4.7 Public Health and Safety |
3/14/08 |
436 |
| 4.8 Biological Resources |
3/14/08 |
1,576 |
| 4.9 Jurisdictional Wetlands |
3/14/08 |
234 |
| 4.10 Transportation |
3/14/08 |
282 |
| 4.11 Air Quality |
3/14/08 |
346 |
| 4.12 Noise |
3/14/08 |
528 |
| 4.13 Cultural Resources |
3/14/08 |
311 |
| 4.14 Visual Resources |
3/14/08 |
1,508 |
| 4.15 Public Services and Utilities |
3/14/08 |
563 |
| 4.16 Energy |
3/14/08 |
408 |
| Chapter 5 Geysers Summary |
3/14/08 |
402 |
| Chapter 6 Storage Summary |
3/14/08 |
1,652 |
| Chapter 7 Combinations of Alternatives |
3/14/08 |
165 |
| Chapter 8 CEQA-Required Sections |
3/14/08 |
401 |
| VOLUME 3 of 6: Draft Environmental Impact Report |
| Appendix A Agency Response Letters to the Notice of Preparation/Initial Study |
3/14/08 |
3,446 |
| Appendix B Final Screening Report |
3/14/08 |
473 |
| Appendix C Cumulative Projects List |
3/14/08 |
240 |
| Appendix D Surface Water Hydrology |
| Appendix D.1 Potential Streambank Erosion |
3/14/08 |
276 |
| Appendix D.2 Potential Flood Impacts |
3/14/08 |
230 |
| Appendix E Evaluation of Impacts Resulting from DCP Discharge to Surface Water |
3/14/08 |
9,395 |
| Appendix F Human Health Risk Assessment |
3/14/08 |
2,611 |
| Appendix G Biological Resources |
| Appendix G.1 Special-Status Plants |
3/14/08 |
150 |
| Appendix G.2 Special-Status Animals |
3/14/08 |
100 |
| Appendix G.3 Ecological Risk Assessment |
3/14/08 |
456 |
| Appendix G.4 Potential Impacts of the Discharge Compliance Project on Chinook Salmon, Coho Salmon, & Steelhead |
3/14/08 |
174 |
| Appendix G.5 Distribution and Growth of Invasive Ludwigia in the Laguna de Santa Rosa |
3/14/08 |
371 |
| Appendix G.6 Special-Status Vegetation Communities |
3/14/08 |
295 |
| Appendix H Roadway Congestion Analysis |
3/14/08 |
23 |
| Appendix I Air Quality Calculations |
3/14/08 |
67 |
| Appendix J Annual Energy Consumption by Component |
3/14/08 |
55 |
| Appendix K Department of Health Services Criteria Letter |
3/14/08 |
174 |
| Appendix L Engineering Report Updates |
3/14/08 |
950 |
| VOLUME 4 of 6: Draft Engineering Report |
| Draft Engineering Report |
11/21/07 |
591 |
| Figures 1-1 to 1-4 |
11/21/07 |
8,717 |
| Figures 3-1 to 3-5 |
11/21/07 |
700 |
| Figures 4-1 to 4-4 |
11/21/07 |
7,037 |
| Figures 5-1, Tables 5-2 and 5-3 |
11/21/07 |
72 |
| Figures 5-2 to 5-5 |
11/21/07 |
10,965 |
| Figures ES-2 |
11/21/07 |
5,030 |
| Plate 1 |
11/21/07 |
14,525 |
| VOLUME 5 of 6: Technical Memoranda D-1a to D-5 |
| TM D-1a Initial Direct Discharge Facility Evaluation and Siting Analysis |
11/21/07 |
12,349 |
| TM D-1b Descriptions of Direct Discharge Facility Components |
11/21/07 |
4,266 |
| TM D-1c Descriptions of Laguna Discharge Facility Components |
11/21/07 |
6,146 |
| TM D-2a Initial Conveyance System Facility Evaluation and Siting Analysis |
11/21/07 |
7,693 |
| TM D-2b Descriptions of Pipeline Facility Components |
| Executive Summary and Tables |
11/21/07 |
60 |
| Figures 1-2 |
11/21/07 |
8,282 |
| Figures 3 |
11/21/07 |
6,340 |
| Figures 4-5 |
11/21/07 |
11,136 |
| Figures 6 |
11/21/07 |
6,150 |
| Figures 7-9 |
11/21/07 |
9,660 |
| TM D-3a Geotechnical/River Stability Fatal Flaw Analysis |
| Table of Contents and Technical Memorandum |
11/21/07 |
124 |
| Figures 1-9 |
11/21/07 |
7,050 |
| Figures 10-18 |
11/21/07 |
10,910 |
| Plate 1 and Appendices |
11/21/07 |
1,205 |
| TM D-3b Reconnaissance-Level Geologic and Geotechnical Hazard Assessment |
11/21/07 |
8,570 |
| TM D-3c Geomorphologic Reconnaissance of Direct Discharge Candidate Sites on the Russia River |
11/21/07 |
5,777 |
| TM D-4 Surface Water Mixing Analysis |
11/21/07 |
11,464 |
| TM D-5 Winter-Spring 2006 Evaluation of Recycled water and Receiving Water Copper, Lead, and Nickel |
11/21/07 |
664 |
| VOLUME 6 of 6: Technical Memoranda D-6 to D-13 and I-2 to I-9 |
| TM D-6 Laguna and Russian River Water Quality Model Summary |
11/21/07 |
3,047 |
| TM D-7 Water Balance Model Summary |
11/21/07 |
925 |
| TM D-8 Xenobiotics Update |
11/21/07 |
191 |
| TM D-9 Temperature and Dissolved Oxygen Compliance Evaluation |
11/21/07 |
2,040 |
| TM D-10 Advanced Membrane Treatment Evaluation |
11/21/07 |
210 |
| TM D-11 Enhanced Nutrient Removal Evaluation |
11/21/07 |
2,004 |
| TM D-12 Descriptions of Pump Stations and Treatment Facility Components |
| Executive Summary and Text |
11/21/07 |
244 |
| Figures 1-11 |
11/21/07 |
1,746 |
| Figures 12-16 |
11/21/07 |
10,165 |
| Figures 17-20 |
11/21/07 |
11,769 |
| Figures 21-24 |
11/21/07 |
9,964 |
| Figures 25-28 |
11/21/07 |
9,630 |
| Figures 29-30 |
11/21/07 |
4,872 |
| Figures 31-34 |
11/21/07 |
10,702 |
| Figures 35-38 |
11/21/07 |
12,439 |
| Figures 39-45 |
11/21/07 |
11,832 |
| Figures 46-62 |
11/21/07 |
1,224 |
| TM D-13 Engineering Estimate of Probable Costs |
11/21/07 |
289 |
| TM I-2 Initial Indirect Discharge Facility Evaluation and Siting Analysis |
11/21/07 |
9,532 |
| TM I-3 Subregional Soil Column Study |
11/21/07 |
627 |
| TM I-5 Indirect Discharge Water Quality Constituent Attenuation Summary |
11/21/07 |
617 |
| TM I-6 Infiltration/Percolation Sustainable Rate Assessment |
11/21/07 |
2,077 |
| TM I-8 Regional Groundwater - Surface Water Interactions along the Russian River and the Laguna de Santa Rosa |
11/21/07 |
12,208 |
| TM I-9 Groundwater Modeling for Indirect Discharge |
11/21/07 |
6,239 |
| Final EIR Erratum |
09/22/08 |
2,212 |
| Final Environmental Impact Report Volumes 1 of 2 |
| VOLUME 1 of 2: Response to Comments and Comment Letters |
| Table of Contents |
09/22/08 |
140 |
| Chapter 1 Introduction |
09/22/08 |
450 |
| Chapter 2 Response to Comments |
09/22/08 |
30 |
| Master Responses |
09/22/08 |
466 |
| Response to Comments Introduction |
09/22/08 |
61 |
| Responses to -- 100 series, Federal Agencies |
09/22/08 |
108 |
| Responses to -- 200-300 series, State, Regional and Local Agencies |
09/22/08 |
813 |
| Responses to -- 400 series, Interested Parties |
09/22/08 |
1,088 |
| Responses to -- 500 series, Interested Individuals |
09/22/08 |
231 |
| Responses to -- 600 series, Public Hearing Comments |
09/22/08 |
118 |
| Chapter 3 Impacts of Environmentally Superior Combinations of Components |
09/22/08 |
642 |
| Chapter 4 Lead Agency Changes |
09/22/08 |
430 |
| Chapter 5 Comment Letters and Oral Comments (listed below) |
| Comment Letters Federal Agencies (Comment Letters 100's) |
09/22/08 |
1,711 |
| Comment Letters State, Regional and Local Agencies (Comment Letters 200's - 300's) |
09/22/08 |
3,143 |
| Comment Letters Interested Parties (Comment Letters 401 - 413) |
09/22/08 |
12,479 |
| Comment Letters Interested Parties (Comment Letters 414 - 417) |
09/22/08 |
8,535 |
| Comment Letters Individuals (Comment Letters 500's) |
09/22/08 |
4,803 |
| Transcript from Public Hearing (Comment Letters 600's) |
09/22/08 |
794 |
| Chapter 6 List of Preparers and References |
09/22/08 |
57 |
| VOLUME 2 of 2: Replacement Pages |
| Chapter 1 Introduction |
09/22/08 |
41 |
| Chapter 2 Replacement Pages |
09/22/08 |
6,216 |
| Exhibits |
| Exhibit A DCP EIR Evaluation of Cumulative Concentrations of Recycled Water in Groundwater and Surface Water Resulting from DCP Discharge to the Russian River and Cumulative Projects |
09/30/08 |
163 |
| PPT presented at BPU Public Hearing for DCP Draft EIR |
4/3/08 |
99 |
| IRWP Discharge Compliance Project Identification of Alternatives for the EIR PowerPoint |
12/05/06 |
1,600 |
| PPT presented to BPU for considering Draft Screening Report |
11/16/06 |
224 |
| PPT presented to BPU to consider authorizing distribution of NOP for Discharge Compliance Project EIR (pdf) 4 slides/pg |
7/20/06 |
3,998 |
| Discharge Compliance studies PPT as reported to the BPU IRWP project consultant team (pdf) 4 slides/pg |
4/21/05 |
28,151 |